August 22, 2026
How Much Does a DADU Feasibility Study Cost in Seattle?
The Question Every Seattle Homeowner Asks First
Before most Seattle homeowners commit to a DADU project, they want to know two things: can I build on my lot, and what will it cost? The DADU feasibility study answers both questions — and it does so before you spend thousands of dollars on architectural drawings that may or may not be permittable.
But homeowners often ask a third question first: how much does the feasibility study itself cost?
It is a fair question. You are being asked to invest in a professional analysis before you have committed to the project. Understanding what that investment covers — and what it protects you from — is the right way to evaluate it.
This guide gives you an honest, detailed breakdown of DADU feasibility study costs in the Seattle area in 2026.
What Does a DADU Feasibility Study Actually Cost?
In the Seattle metro area, a professional DADU feasibility study typically costs between $1,500 and $5,000 depending on the scope of analysis, the complexity of your lot, and the firm you work with.
At the lower end of that range — $1,500 to $2,500 — you will typically find studies that cover the core zoning and code analysis: setbacks, lot coverage, height limits, and basic utility review. These are appropriate for straightforward lots without significant complicating factors.
At the higher end — $3,000 to $5,000 — studies typically include more detailed site analysis, topographic review, tree assessment, utility capacity evaluation, and in some cases a preliminary site plan showing where a DADU could be positioned on your lot.
At DADU Solutions, our Pre-Design Feasibility Study is priced at $1,900. It covers the full zoning and code analysis, a review of your lot's critical areas and utility connections, a site-specific assessment of what you can build and where, and a clear written report you can take to any architect or builder. We have structured the price to be accessible to homeowners who are still in the evaluation stage — not just those who have already committed to building.
What Is Included in a Thorough Feasibility Study?
Not all feasibility studies are created equal. When evaluating what you are getting for your money, here is what a thorough study should cover.
Zoning and Code Analysis confirms your zoning district and identifies all applicable development standards — setbacks from every property line, lot coverage limits, height restrictions, and any overlay zones or special regulations that apply to your property.
Existing Coverage Calculation measures the footprint of every existing structure on your lot — your home, garage, sheds, covered patios, and any paved surfaces that count toward impervious coverage — and compares it to your allowable maximum. This tells you exactly how much square footage is available for a new structure.
Utility Review examines your water, sewer, and electrical connections to identify any capacity issues or upgrade requirements that would affect your project cost and timeline.
Critical Areas Assessment identifies any trees, slopes, wetlands, streams, easements, or other site conditions that could restrict where and how you build.
Site-Specific Buildability Assessment synthesizes all of the above into a clear answer: here is what you can build, here is where you can build it, and here are the constraints that will shape your design.
Written Report documents the findings in a format you can share with architects, builders, and lenders. A verbal summary is not sufficient — you need a written record you can reference throughout the project.
What Does a Feasibility Study Protect You From?
The real value of a feasibility study is not what it costs — it is what it prevents you from spending.
The most common and costly mistake Seattle homeowners make is investing in architectural design before confirming their lot can support the project. Custom architectural drawings for a DADU typically cost $15,000 to $35,000. Structural engineering adds another $3,000 to $6,000. If you reach the permit application stage and discover that a utility easement, setback violation, or tree protection zone makes your design unpermittable, you have spent $20,000 to $40,000 on plans you cannot use.
A $1,900 feasibility study prevents that outcome. It tells you exactly what is possible on your lot before you commit to a design direction. If your lot cannot support the project you have in mind, you find out for $1,900 instead of $30,000. If your lot can support it, you move into design with confidence — knowing your architect is working within confirmed parameters.
For homeowners who are still deciding whether to build at all, a feasibility study is also the most efficient way to evaluate the opportunity. It gives you the information you need to make a confident go or no-go decision without committing to the full project.
How Does a Feasibility Study Compare to the Full Project Cost?
To put the cost of a feasibility study in context, here is how it compares to the other major cost categories in a typical Seattle DADU project.
Feasibility Study: $1,900 to $5,000. Architectural Design and Engineering: $18,000 to $41,000. Permit Fees (City of Seattle): $8,000 to $15,000 depending on project scope. Site Preparation and Foundation: $25,000 to $60,000. Construction: $300,000 to $450,000 for a 800 to 1,000 square foot DADU. Total Project: $375,000 to $550,000 or more.
Against a total project investment of $400,000 to $550,000, a $1,900 feasibility study represents less than half of one percent of your total budget. It is the least expensive line item in the entire project — and arguably the most valuable one.
For homeowners who want to move directly from feasibility into permit-ready plans, our Full Feasibility and Permitting Package at $9,500 includes the feasibility study plus architectural drawings, structural engineering, and a complete permit application package. This is the most cost-efficient path for homeowners who have confirmed they want to build and are ready to move forward.
The Bottom Line: Feasibility First, Always
A DADU feasibility study is not an optional preliminary step. It is the foundation of every successful project — the analysis that tells you what is possible before you invest in what is expensive.
In the Seattle area in 2026, a thorough feasibility study costs $1,900 to $5,000 depending on scope and complexity. At DADU Solutions, our Pre-Design Feasibility Study is $1,900 and covers everything you need to know about your lot before you commit to a design direction.
If you own property in Seattle, Bellevue, Redmond, Kirkland, Edmonds, Mercer Island, or anywhere else in the greater Seattle area, and you are curious about whether a DADU makes sense for your lot, a feasibility study is the right first step. It is the most valuable investment you will make in the entire project — and it costs less than a month of rent on the unit you are thinking about building.