What Does a DADU Feasibility Study Include? A Complete Breakdown
Why the Feasibility Study Exists
A DADU feasibility study exists to answer one fundamental question: can you build a DADU on your specific lot, and if so, what can you build?
That question sounds simple. The answer is not. It requires a systematic review of your zoning district, your lot's dimensions and existing coverage, the applicable development standards, your utility connections, any site-specific constraints, and the realistic cost and timeline implications of what the analysis reveals.
A thorough feasibility study gives you that answer in writing — with enough specificity that you can take it to an architect, a builder, and a lender and have a productive conversation with each of them. It is the document that transforms a vague idea into a fundable, designable, permittable project.
This post explains exactly what a professional DADU feasibility study should include — so you know what to look for when evaluating your options.
Zoning and Regulatory Analysis
The first component of a thorough feasibility study is a complete zoning and regulatory analysis for your specific lot.
This begins with confirming your zoning district — not just the general zone designation, but any overlay zones, special regulations, or conditions that apply to your property. A lot in a shoreline management zone, a historic district overlay, or a critical areas buffer has additional requirements that a standard zoning analysis would miss.
The regulatory analysis then identifies every development standard that applies to your proposed DADU: minimum lot size requirements, setback requirements from all four property lines, the building separation requirement between the DADU and the primary residence, maximum height limits, lot coverage limits, and any design standards that apply in your zone.
For each standard, the analysis should state the requirement clearly and explain how it applies to your specific lot — not just quote the code section, but translate it into what it means for your project.
Existing Lot Coverage Calculation
One of the most technically important components of a feasibility study is the existing lot coverage calculation.
Lot coverage limits restrict the total percentage of your lot that can be covered by structures. Before you can know how much room you have for a new DADU, you need to know precisely how much coverage your existing structures already consume.
This calculation requires measuring the footprint of every structure on your lot — your primary residence, any attached or detached garages, sheds, covered patios, and other accessory structures. It then compares the total measured coverage to the maximum allowed under your zoning district's lot coverage limit.
The difference between your existing coverage and the maximum allowed is your remaining coverage budget — the maximum footprint your DADU can have. On many Seattle-area lots, this number is smaller than homeowners expect, particularly on lots with large primary residences or existing garages.
A professional feasibility study calculates this number from actual measurements, not estimates. The difference between an estimated and a measured calculation can be the difference between a project that is feasible and one that is not.
Buildable Area Analysis and Siting Options
With the setback requirements confirmed and the existing lot coverage calculated, the feasibility study can identify the buildable area available for a DADU — the zone on your lot where a new structure can be placed within all applicable constraints.
This analysis should produce a site diagram showing the buildable area clearly, along with the dimensions of that area. It should also identify any practical constraints within the buildable area — existing trees that are subject to protection requirements, utility easements, drainage patterns, or access considerations — that would affect where within the buildable area a DADU could realistically be sited.
For most lots, there is more than one possible location for a DADU within the buildable area. The feasibility study should identify the primary options and note the tradeoffs between them — proximity to the primary residence, access from the street or alley, solar orientation, privacy from neighbors, and impact on the primary residence's outdoor space.
Utility Assessment and Cost Implications
A DADU is a complete dwelling unit — it needs water, sewer, electrical service, and in most cases natural gas or a heat pump. The feasibility study should assess whether your existing utility connections can support a second dwelling unit, or whether upgrades will be required.
The utility assessment covers your water meter size and whether it can support the additional demand of a DADU, your sewer lateral capacity and condition, your electrical service panel capacity, and the location and accessibility of utility connections relative to the proposed DADU site.
Utility upgrades can add $15,000 to $40,000 or more to a project's total cost, depending on what is required. Identifying these costs in the feasibility phase — before you have committed to a design or a contractor — allows you to budget accurately and make informed decisions about project scope.
Cost Range, Timeline, and Next Steps
A complete feasibility study concludes with a realistic cost range for the project, a projected timeline from permit application to Certificate of Occupancy, and a clear set of recommended next steps.
The cost range should be based on the specific scope of what the analysis has determined is buildable on your lot — not a generic square-footage estimate, but a range that accounts for your lot's specific conditions, the required utility work, and current labor and material costs in the Seattle market.
The timeline projection should account for the current permit review timeline in your city, the typical duration of the design and engineering phase, and the construction timeline for a project of the scope identified in the analysis.
The next steps section should tell you exactly what to do with the information in the report — whether that is proceeding to design, addressing a specific site constraint first, or reconsidering the project scope based on what the analysis revealed.
At DADU Solutions, our Pre-Design Feasibility Study at $1,900 covers every component described in this post. The deliverable is a written report — not a verbal summary — that you can use immediately to move your project forward with confidence.